GE
Global Earthmoving
← Back to Case Studies
Construction

Arabian Heavy Duty

Result: Increased fleet uptime by 18%
Arabian Heavy Duty

With 150 machines active across massive excavation sites, Arabian Heavy Duty adopted our fleet portal. Proactive shipping of wear parts significantly minimized emergency breakdowns, transforming reactive repair into a scheduled maintenance machine.

The Challenge

When operating at the scale of Arabian Heavy Duty, even a single hour of unscheduled downtime reverberates across the entire supply chain. Traditional procurement channels were too slow, often quoting 3-4 weeks for critical path components, putting entire project timelines at risk.

Our Technical Solution

Utilizing our proprietary Fleet Portal and Global Freight network, we mapped Arabian Heavy Duty's entire active machine registry. This allowed for predictive wear-part staging and instantaneous dispatch of critical emergency assemblies strictly from our closest geographic hubs.

Ready to secure your fleet?