GE
Global Earthmoving
← Back to Case Studies
Construction

Euro Construct

Result: Reduced logistics cost by $450k
Euro Construct

Facing squeezed margins, Euro Construct tapped into our bulk order portal. By rerouting through our Germany hub, they saved significantly on heavy undercarriage wear parts over the duration of the European stadium megaproject.

The Challenge

When operating at the scale of Euro Construct, even a single hour of unscheduled downtime reverberates across the entire supply chain. Traditional procurement channels were too slow, often quoting 3-4 weeks for critical path components, putting entire project timelines at risk.

Our Technical Solution

Utilizing our proprietary Fleet Portal and Global Freight network, we mapped Euro Construct's entire active machine registry. This allowed for predictive wear-part staging and instantaneous dispatch of critical emergency assemblies strictly from our closest geographic hubs.

Ready to secure your fleet?